2006-2008 Handling of 12.5 x 10 6 M 3 f. deposits from the area of Sector 6 A1 of the Kardias Mine. (VALUE 16,012,767.25 EUROS) 

2008-2009 Handling of 14 x 10 6 M 3 ft. of overburden and lignite deposit from the Eastern Extension Kommenou .(VALUE 3,790,143.68 EUROS)

2010 Transport of 2.0 x 10 6 M 3 f Agons from the area of the external deposit – Northwest Slopes of Heart Field Mine. (VALUE 488,036.12 EUROS)

2010 Transfer of 521,670 m3 of lignite deposit from the wider area of the Komanou farm of the Heart Field Mine.

2010-2012 Handling of 17.1 x 10 6 M 3 ft. of overburden from the bust and floors of E1 of the Mine Mavropigis. (VALUE 6,584,016.21 EUROS)

2010-2012 Handling of 19.4 x 10 6 M 3 Handling of 19.4 x 10 6 M 3 f. of overburden and lignite deposit from wider area of Komanou of the Kardia Field Mine. (VALUE 5,952,728.72 EUROS)


2011 Loading, transportation, laying of non-extractable quantity of lignite of the A yard in extractable position of the A or B house. (VALUE 41,870.00 EUROS) 

2011-2012 Loading, transport, laying of non-deductible quantity of A material in deductible location of yard A. (VALUE 176,000.00 EUROS)2011-2012 Promotion and laying of lignite in the A and B yard of the station one boosters equivalent capacity with caterpillar type D7 or larger. (24,690.60 EUROS)

2011-2012 Handling of 3,101 x10 6 M 3 f. of overburden from the bust and floors of E1 of the Mine Mavropigis. (VALUE 2,440,448.83 EUROS)

2011-2012 Movement of 4.37 x 10 6 M 3 ft. of overlying lignite deposit from the Mavropigis Mine (VALUE 3,449,959.15 EUROS)

2012 Handling of 100,000 tons of lignite from the Bunker area and 190,000 tons of lignite from the depositor A6 of the South Field Mine to AIS Agios Dimitrios. (488,849.70 EUROS).

2013-2014 Loading, transportation, laying, laying of non-absorbable amount of lignite in the lignite wastes and no transfer of lignite quantities. (VALUE 187,600.00 EUROS)

2014-2016 Excavation, loading, transport, deposition and 12.00 X 10 6 M 3 f. view from the fronts and terminals of excavators E1&E2 of the Kardias Field Mine. (VALUE 16,218,809.50 EUROS)

2017-2018 Excavation, loading, transport, depositing and paving 12.00 x 10 6 M 3 floors of overburden etc. view from the fronts and terminals of excavators E1 and E2 of the Heart Field Mine. (VALUE 4,578,762.50 EUROS)

2018 Excavation, loading, transport, depositing at the South Field Mine of ash pits B and C liquid waste treatment system and other auxiliary works of Saint Ag. Dimitrios. (VALUE 118,000.00 EUROS).

2018 Handling and excavation of rough materials as well as auxiliary works in the Achladas lignite mines. (VALUE 99,349.76)

2018-2019 Handling of 120,000 M 3 and 320,000 M 3 tons of scrapings from the overburden complexes of conveyor belts respectively of ONP. (VALUE 461,468.00 EUROS)

2018-2019 Excavation, loading, hauling, placing and paving 3.65 x 10 6 for slope formation at the crowning of the landslide area of the Amyntaio Mine. (VALUE 1,309,085.00 EUROS)

2019 Handling 9.88 x 10 6 M 3 f. of supernatants from film western slopes and supporting works of Mavropigis Mine. (VALUE 1,500,000.00 EUROS)

2019-2020 Transfer of 6.2×10 6 M 3 ft. of overburden from the bust of theMavropigis Mine. (VALUE 2,314,000.00 EUROS)

2020 Excavation, loading, transport, depositing and laying 6.3 x 10 6 M 3 f. of supertexts from the bust of Mavropigi Mine. (VALUE 2,117,000.00 EUROS)

2021 Drilling, excavation, loading, transport and laying-laying of 7.0x106M3 sq. hard and of semi-hard overlying formations from Sector 7 of the South Field Mine to its internal deposit. (VALUE 3,598,000.00 EUROS)

2021 Motorway of Central Greece E-65 and New Public Departments (PATHE)